Télécharger Imprimer la page

Grohe F-digital 36 351 Manuel D'installation page 4

Publicité

Les langues disponibles

Les langues disponibles

Safety notes
Prevent danger resulting from damaged power
supply cables. If damaged, the power supply cable
must be replaced by the manufacturer or his
customer service department or an equally qualified
person.
• Installation is only possible in frost-free rooms.
• The optional power supply unit is only suitable for indoor use.
• The plug-in connectors must not be directly or indirectly
sprayed with water when cleaning.
• The voltage supply must be separately switchable.
• The maximum permissible distance between the digital
controller of the functional unit and the transceiver
is 16.4 ft.
Application
Thermostatic mixers are designed for hot water supplies from
pressurised storage heaters and offer the highest temperature
accuracy when used in this way. With sufficient power output
(from 18 kW or 250 kcal/min), electric or gas instantaneous
heaters are also suitable.
Thermostats cannot be used in connection with unpressurised
storage heaters.
All thermostats are adjusted in the plant at a flow pressure
of 0.3 MPa (45 psi) on both sides.
Technical data
• Flow pressure
- Minimum flow pressure without downstream
resistances:
Minimum flow pressure with downstream
resistances:
- Recommended
• Operating pressure
• Test pressure
If static pressure exceeds 0.5 MPa (72.5 psi) a pressure-
reducing valve must be fitted.
Avoid major pressure differences between hot and cold water
supply.
• Flow rate at 0.3 MPa (45 psi) flow pressure:
• Minimum flow rate:
• Hot water supply temperature:
• Recommended (energy saving):
• Hot water temperature at supply connection min. 36 °F
higher than mixed water temperature.
• Voltage supply:
• Power consumption:
• Radio frequency:
• Transmitter power:
• Digital controller battery:
3x 3 V lithium batteries (type CR 2450)
• Automatic safety shut-off (plant setting):
• Safety stop (plant setting):
• Type of protection: - Functional unit
- Digital controller
- Transceiver
• Water connection:
Electrical test data
• Software class:
• Contamination class:
• Rated surge voltage:
• Temperature for ball impact test:
1
English
The test for electromagnetic compatibility (interference
emission test) was performed at the rated voltage and rated
current.
Approval and conformity
This device complies with part 15 of the FCC Rules (USA) and
with the RSS of the IC Rules (Canada).
Operation is subject to the following two conditions:
This device may not cause harmful interference, and this
device must accept any interference received, including
interference that may cause undesired operation.
Changes or modifications not expressly approved by the party
responsible for compliance may void the user's authority to
operate the equipment.
Electrical installation
the regulations according to IEC 364-7-701-1984
(corresponding to VDE 0100 Part 701) as well as
all national and local regulations.
Rough installation
During installation, please note:
• The functional unit must be accessible for maintenance
• The functional unit must not be installed with the lid facing
0.1 MPa (14.5 psi)
• A vacant tube must be used to connect the functional unit to
0.2 MPa (29 psi)
• The plug-in connectors and the transceiver must be
0.2 – 0.5 MPa (29 - 72.5 psi)
max. 1.0 MPa (145 psi)
Prepare the wall for the installation, refer to the dimensional
1.6 MPa (232 psi)
drawing on fold-out page I and Fig. [1] on fold-out page II.
Install functional unit, see fold-out page II, Figs. [1] to [5].
Observe printing on the lid, see Fig. [2].
1. Prepare holes for the functional unit as well as slots for
2. Unscrew screw (H) and remove lid, see Fig. [2].
approx. 13.2 gpm
3. Align and fasten functional unit in place, see Fig. [3].
1.3 gpm
4. The cold water supply must be connected to the inlet
min. 122 °F - max. 176 °F
140 °F
120 V AC, 50/60 Hz
9 VA
Do not solder the connections.
2.4332 GHz
5. Route the mixed water outlet to the points of discharge.
< 1 mW
Route connection cable in vacant tube, see Fig. [5].
Max. two extension cables can be combined (max. 19.7 ft),
see Replacement parts, fold-out page I.
6. Attach the plug-in connector (B) to the power supply unit and
20 min
100 °F
IP 40
7. Install transceiver (C) in the inspection chamber or on the
IP X5
IP X5
Flush the functional unit, see fold-out page II, Figs. [6]
COLD/HOT
and [7].
1. Remove screw plug (D), see fold-out page II, Fig. [6].
B
2. Remove the non-return valve (E) and the filter (F).
2
3. Install the flushing plugs (G) in the non-return valve seat
2,500 V
212 °F
4. Open the cold and hot water supply.
Electrical installation work must only be
performed by a qualified electrician. This
work must be carried out in accordance with
work.
downwards.
the power supply unit and to the transceiver.
accessible.
the pipes and vacant tubes, see fold-out page II, Fig. [1].
marked COLD, the hot water to the inlet marked HOT,
see Fig [4].
GROHE recommends installing isolating valves
upstream of the functional unit to facilitate servicing.
to the functional unit.
Do not connect voltage supply yet.
wall and attach the plug-in connector.
recesses, see Fig. [7].

Publicité

loading