Télécharger Imprimer la page

Broan best P195 Mode D'emploi page 6

Masquer les pouces Voir aussi pour best P195:

Publicité

Les langues disponibles

Les langues disponibles

INSTALL THE DUCTWORK
NOTE: To reduce the risk of fire, use only
metal ductwork.
1. Decide where the ductwork will run between
the hood and the outside.
2. A straight, short duct run will allow the hood
to perform most efficiently.
3. Long duct runs, elbows, and transitions will
reduce the performance of the hood. Use as
few of them as possible.
4. Use duct tape to seal the joints between
ductwork sections.
Ducted configuration:
Install a roof or wall cap. Connect 6" round metal
ductwork (8" for version 2 motors) to cap and
work back towards hood location.
INSTALL DUCT CONNECTOR
1. Fix the duct connector onto the hood; it must
be fixed either by means of mounting screws
(3.9x9.5mm).
2. Remove the tape located on the damper.
VERSION 2 MOTORS
MOUNTING SCREWS
REMOVE THE TAPE
All manuals and user guides at all-guides.com
(3.9x9.5mm)
- 6 -
DUCTED CONFIGURATION
ROOF CAP
6" ROUND DUCT
(8" for version 2
HOOD
24" TO 30" ABOVE
COOKING SURFACE
VERSION 1 MOTOR
MOUNTING SCREWS
(3.9x9.5mm)
REMOVE THE TAPE
motors)
WALL
CAP
6" ROUND
ELBOW
(8" for
version 2
motors)

Publicité

loading