Télécharger Imprimer la page

Kessel Ecolift SPZ 1000 Instructions De Pose Et D'utilisation page 25

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 34
4.1.3
Maximum installation depth
A maximum installation depth of 650 mm to the top surface
of the functional unit (e.g. the pump) should be observed
for the installation in the floor slab. This way, the necessary
parts can be reached for maintenance and servicing.
4.2
Mount and align the drain body
Connect the two sockets on the inlet (3) and outlet side
(1) to the drain body (2).
The quick-release closures (4) on the drain body enable
fast installation.
Connect the backwater pumping station to the pipe sys-
tem.
(A)
Floor slab installation
(B)
Installation in exposed drainage pipe
(C)
Arrow for flow direction
Always pay attention to the direction of flow (see arrow
(C)).
Use a spirit level to align the drain body.
010-844
All manuals and user guides at all-guides.com
Installation and operating instructions
25 / 104

Publicité

loading