Télécharger Imprimer la page

Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

VANITY DOOR MOUNT WASTE CONTAINER
TOOLS REQUIRED:
5
#2
64
ESTIMATED ASSEMBLY TIME:
5 MIN
CARE AND MAINTENANCE:
Clean with a damp cloth and
wipe parts dry.
WATCH TUTORIALS OF OUR
PRODUCTS BEING INSTALLED
WWW.REV-A-SHELF.COM/VIDEOS
No
A
B
C
D
E
F
A.
E.
INSTALLATION INSTRUCTIONS: VANITY DOOR MOUNT WASTE CONTAINER
PARTS LIST:
Description
Wire Frame
8 L Waste Container w/ Lid
M4 x 8MM Flat Head Phillips Screw
#6 x 5/8" Phillips Flat Head Sheet Metal Screws
#6 Phillips Head Screw Caps
Door Mount Bar
B.
F.
12400 Earl Jones Way
Louisville, KY 40299
rev-a-shelf.com
Customer Service: 800-626-1126
QTY
1
1
4
4
6
1
C.
D.
I-5SOWC-0628

Publicité

loading

Sommaire des Matières pour Rev-A-Shelf 5SOWC-8-1

  • Page 1 12400 Earl Jones Way Louisville, KY 40299 rev-a-shelf.com Customer Service: 800-626-1126 VANITY DOOR MOUNT WASTE CONTAINER TOOLS REQUIRED: ESTIMATED ASSEMBLY TIME: 5 MIN CARE AND MAINTENANCE: Clean with a damp cloth and PARTS LIST: wipe parts dry. Description Wire Frame...
  • Page 2 5/8" flat head Phillips Sheet Metal screws (See Figures 2B and 2C). STEP 3 FIG. 2C FIG. 3 Insert waste container with lid into the wire holder and product is ready for use (See Figure 3). Customer Service: 800-626-1126 | rev-a-shelf.com...
  • Page 3 12400 Earl Jones Way Louisville, KY 40299 rev-a-shelf.com Customer Service: 800-626-1126 INSTRUCCIONES DE INSTALACIÓN / INSTRUCTIONS D’INSTALLATION CONTENEDOR DE BASURA PARA MONTAJE EN PUERTA DE TOCADOR POUBELLE POUR PORTE DE LAVABO Herramientas requeridas: Outils Requis: Tiempo estimado de ensamblado: Durée de l’installation: 5 MIN LISTA DE PARTES / LISTE DES PIÈCES...
  • Page 4 (Ver Figura 3). Insérez le conteneur de déchets avec son couvercle dans le porte- fil et le produit est prêt à être utilisé (voir la figure 3). Customer Service: 800-626-1126 | rev-a-shelf.com...