3) Place the cell beaker in its location, making
sure that the joints of both ends are correctly
placed in their housing.
4) Place the locking hooks between the
fittings and the cell inlet/outlet. Tighten them
with an Allen key to ensure watertightness.
5) Check that the cell is properly installed
inside the housing, including the O-ring
between the round cell cover and the
housing.
6) Depending on where you want to locate
the control unit, proceed as follows:
Attention:
Please, ensure that the connection cables between the cell
and the control unit, are placed over the green mark.
MOUNTING A - (cell and control unit mounted together)
a) Insert the control unit into the front housing of the cell.
b) Connect the 3 cables through the aerial connectors on the top of both
elements.
c) Place the top cover and tighten the 3 threaded knobs firmly.
MOUNTING B - (wall-mounted control unit)
a) Install the control unit on the wall, through the anchoring accessories
located at the back of the control unit. Make sure there is no excessive
distance so that the extension cable allows you to connect correctly.
b) Connect the extension cable between the cell and control unit wires.
c) Place the top cover of the cell and tighten the 3 threaded knobs firmly.
MANUAL DE USUARIO
Locking hook
41