Télécharger Imprimer la page

Allmatic INT VS 24V Manuel Technique D'installation page 18

Publicité

Les langues disponibles

Les langues disponibles

All manuals and user guides at all-guides.com
BOX INSTALLATION PROCEDURE
C1
Dig a hole big enough to hold
410mm
the box containing the operator
(C1)
345mm
Insert the tube for water
drainage in the prepared hole
(F1)
Insert the sheath for laying the
power cables (F2).
F 2
165mm
F 1
Note: while positioning the box,
keep in mind the minimum
distance there must be between
the pillar and the centre of
rotation of the gate hinge.
75mm
Cement so that the box cannot
be moved, wait for it to dry and
then assemble the operator and
levers.
Distance between
Pillar - Hinge Centre
Pag. 6

Publicité

loading

Ce manuel est également adapté pour:

Int vs 230vInt vs