Electric Installation Of The Safety Switches - PFB LK200 Notice D'utilisation Et D'entretien

Table des Matières

Publicité

2.3

ELECTRIC INSTALLATION OF THE SAFETY SWITCHES

All the works concerning the electrical equipment should only be carried out by specialized
electricians, skilled workers.
Before beginning operations, turn off the power of all the parts of the plant.
When laying the connection cables, take care that:
• unipolar cables have a double coating;
• the use and laying of the cables are carried out according to the EMV rules and regulations.
The safety switches disconnect the safety circuit of the elevator plant.
The following safety switches must be connected:
Fig. 1
Overspeed governor
type LK120 LX150/180
LK200/250/300/315
without remote control
Safety
switch
Safety
switch
Fig. 2
Overspeed governor
type LK120 LX150/180
LK200/250/300/315
with remote control
Fig. 5
Tension weight with
vertical counterweight
complete with safety
switch
Fig. 3
Overspeed governor
type LK120 LX150/180
LK200/250/300/315
with uncontrolled car
movement device
Safety
switch
Fig. 4
Tension weight with horizontal
counterweight complete with safety
switch
41

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Lk250Lk300Lk315Lx150Lx180Lk120

Table des Matières