9
HS(X3)
10
FLOOR FASTENING KIT
All floor fastening actions must be carried
out inside the shed.
To fasten the side and back walls (part HS):
Long side
down
Repeat this step for all circled locations on the diagram above.
HRP(X1)
HS
HCS(X12)
HS
sC15(X12)
HCS x 12
sC15 x 12