Télécharger Imprimer la page

Kohler K-1913 Instructions D'installation page 18

Masquer les pouces Voir aussi pour K-1913:

Publicité

Les langues disponibles

Les langues disponibles

Attach the bath to the support frame.
Controller
9. Position the Bath
All Installations
IMPORTANT! If the installation site is in an area where frequent or prolonged power outages occur,
Kohler Co. recommends that a minimum 350 VA Uninterruptible Power Supply (UPS) be installed as a
backup power source for the bath controller.
IMPORTANT! If a handshower is being installed, follow the instructions packed with the handshower.
Make sure the handshower installation conforms to all applicable backflow prevention requirements.
Install any valving or accessories.
Adjust each of the six leveling feet until they extend 1/4" (6 mm) to 1/2" (13 mm) from the base of
the frame.
Install the grab bar and slotted overflow drain following their installation instructions. If the PVC
pipe included with the drain is too short, cut a new length using commonly available 1-1/2"
Schedule 40 PVC pipe.
If a UPS backup power supply is being installed to the controller, install it now following the UPS
manufacturer's instructions. Do not connect the power source to the UPS at this time.
Reassemble the Bath (if disassembled)
NOTE: The following steps are not required if you did not disassemble the bath. If the bath has not been
disassembled, proceed to "Move the Bath Into the Stud Pocket" steps below.
Cover the area of the bathroom floor where the bath will be reassembled with protective material.
Move the bath and support frame from the staging area to the installation area.
If the bath was removed from the frame, carefully position and center the bath on the frame.
1128532-2-G
All manuals and user guides at all-guides.com
Bottom View
Leveling Foot Locations (6)
18
Install the bath to the frame.
Bracket
Wood Block (4)
Align all of the holes.
Kohler Co.

Publicité

loading