Télécharger Imprimer la page

SICEP NI-UN Manuel D'installation page 23

Publicité

Les langues disponibles

Les langues disponibles

Installer manual
6. Installation procedure
6. 1 . Smoke generator setup
6.2. Nimbus assembly
Installation procedure
The instructions for assembly and connection with necessary steps for the
preparation of the smoke generator are in the manual attached to it.
WARNING!
The replacement of the smoke generator also involves
the replacement of the activation circuit.
• Fixing the container to the
wall with a height of 2.10
to 2.30 meters above the
ground
• Wiring power and start and
control signals.
• Place THE SWITCH according
to the desired settings.
• Feeding the smoke detector.
• Check the operation by
checking the flashing of
the state LED that will
have to show the following
indications:
◦ Test
Status
Maintenance (led BLUE)
◦ Regular status of inputs
(led GREEN)
◦ Flashing
led
(communication
due to lack of smoke
generator connection)
• Connecting the power cord to the smoke generator
• Check the status of the smoke generator with the 3 flashes led GREEN to
indicate the status of REGULARITY.
• Closing the lid with the screws provided
• Inserting the screw cover band.
• Waiting for exit from the state of TEST and MAINTENANCE with the absence of
flashing of the BLUE led.
• The smoke detector is ready to use.
and
VIOLET
error
NI-UN
Fixing holes
Cable entry
Fixing holes
Status LED
IT EN
23

Publicité

loading

Produits Connexes pour SICEP NI-UN