Figure 9. Installing the S4048T–ON in a Front-Rack Configuration
1.
Chassis.
3.
Rail locking feature.
Completing the Ground Wire Installation
After you have installed the S4048T-ON switch in a rack, complete the
installation of the ground wire.
You previously installed the GND lug and bracket assembly, with ground wire
attached, to the S4048T-ON chassis (see Installing the Ground Lug and
Bracket Assembly).
You must supply:
2.
Rail end.
17