of the rail) and remove each casting. Retain the castings for future rack
requirements. It is not necessary to remove the rear flange castings.
2.
Attach one rail to the front post flange with two user-supplied screws.
See item 2 in the following figure.
3.
Slide the plunger bracket forward against the vertical post and secure the
plunger bracket to the post flange with two user-supplied screws. See
item 3 in the following figure.
4.
Repeat this procedure for the second rail.
Figure 5. Two-Post Flush-Mount Configuration
12