Télécharger Imprimer la page

Mitsubishi Electric Mr.Slim SEZ-M71DAL Manuel D'installation page 13

Masquer les pouces Voir aussi pour Mr.Slim SEZ-M71DAL:

Publicité

4. Fixing hanging bolts
4.1. Fixing hanging bolts
[Fig. 4-1] (P.3)
Ⓐ Center of gravity
(Give site of suspension strong structure.)
Hanging structure
• Ceiling: The ceiling structure varies from building to one another. For detailed
information, consult your construction company.
Center of gravity and Product Weight
Model name
SEZ-M25
SEZ-M35
SEZ-M50
SEZ-M60
SEZ-M71
5. Installing the unit
5.1. Hanging the unit body
▶ Bring the indoor unit to an installation site as it is packed.
▶ To hang the indoor unit, use a lifting machine to lift and pass through the
hanging bolts.
[Fig. 5-1] (P.3)
Ⓐ Unit body
Ⓑ Lifting machine
[Fig. 5-2] (P.3)
Ⓒ Nuts (field supply)
Ⓓ Washers (accessory)
Ⓔ M10 hanging bolt (field supply)
W
L
625
752
263
625
952
286
625
952
280
625
1152
285
625
1152
285
• If necessary, reinforce the hanging bolts with anti-quake supporting members as
countermeasures against earthquakes.
* Use M10 for hanging bolts and anti-quake supporting members (field supply).
① Reinforcing the ceiling with additional members (edge beam, etc.) must be
required to keep the ceiling at level and to prevent the ceiling from vibrations.
② Cut and remove the ceiling members.
③ Reinforce the ceiling members, and add other members for fixing the ceiling
boards.
X
Y
Z
351
106
448
104
437
104
527
104
527
104
5.2. Confirming the unit's position and fixing hanging
bolts
▶ Ensure that the hanging bolt nuts are tightened to fix the hanging bolts.
▶ To ensure that drain is discharged, be sure to hang the unit at level using
a level.
Caution:
Install the unit in horizontal position. If the side with drain port is installed
higher, water leakage may be caused.
Product Weight (kg)
17.5
21
22
25.5
25.5
13

Publicité

loading