10.5 minimum combustible mantel clearances
Combustible Mantel clearance can vary according to the mantel depth. Use the graph to help evaluate the clear-
ance needed.
26
24
22
20
18
16
14
12
10
8
6
4
0
MANTEL DIMENSIONS
Ref
A
B
C
D
E
10.6 air fl ow cover installation
Install one air fl ow cover at each end of the burner stiffener rail (2 total)
using 4 screws (supplied).
note:
The air fl ow covers must be installed.
1 2
3 4
5 6
7
8
9
10
MANTEL DEPTH
Height
Depth
29 5/8" (75.2cm)
N/A
8" (20.3cm)
2" (51mm)
10" (25.4cm)
4" (102mm)
12" (30.5cm)
6" (152mm)
14" (35.6cm)
8" (203mm)
fi nishing
E
D
C
B
Appliance
Opening
A
45
W415-1794 / I / 03.23.22
EN