table of contents
EN
1.0
general information
2.0
installation planning
2.1
installation option 1 - open enclosure (enclosure stops short of the ceiling)
2.2
installation option 2 - front opening
2.3
installation option 3 - rear opening
2.4
installation option 4 - open enclosure with hard combustible valance
3.0
appliance overview
4.0
Dynamic Heat Control™ installation
4.1
high limit switch installation
5.0
minimum framing dimensions
6.0
minimum clearance to combustible enclosures
7.0
rough framing - before appliance installation
8.0
finish framing - after appliance installation
9.0
fastener placement restriction
10.0
finishing
11.0
minimum combustible mantel clearances
12.0
maximum protrusion
13.0
completed DHC installation checklist
note:
The information throughout this manual is believed to be correct at the time of printing. Wolf Steel
Ltd. reserves the right to change or modify any information within this manual at any time without
notice. Changes, other than editorial are denoted by a vertical line in the margin.
2
W415-1739 / C / 08.03.17
All manuals and user guides at all-guides.com
3
4
5
5
6
7
8
9
11
13
14
16
17
21
22
23
24
25