8.0 finish framing - after appliance installation
note:
Before framing the appliance, ensure to install the firestop first as it will not fit between the studs if installed after
framing.
There are various methods to ventilate the enclosure. Refer to "Installation Planning" section. Only one option is
illustrated (option 2 - front opening).
single-sided flush
note:
Finish framing must be built after
appliance has been placed in its
final position and
venting connected.
Although the minimum enclosure
height for the LV series is 73",
some venting configurations
that require more vertical rise
will require a larger enclosure to
provide minimum vertical clear-
ance between vent pipes and
combustibles.
Option 2 illustrated (appliance not shown)
minimum framing
Ref
LV38-1
K
39 15/16" (101.4cm)
E
20 1/8" (51.1cm)
53 13/16" (136.7cm)
F
J
73" (185.4cm)
L
Q*
(Q x R)*
* ONLY APPLICABLE TO OPTION 2 AND 3 - Opening must be centered in enclosure on appliance. Dimensions represent
finished sizes and where applicable should be adjusted to include finish material thickness.
All manuals and user guides at all-guides.com
finish framing - after appliance installation
Ceiling
L
J
LV50-2
39 15/16" (101.4cm)
20 1/8" (51.1cm)
65 13/16" (167.2cm)
Optional - Appliance does not need to be elevated above floor
73" (185.4cm)
2" min and 3" max
80 sq. in.
R
Q
K
E
F
Insulation
LV62
39 15/16" (101.4cm)
20 1/8" (51.1cm)
77 13/16" (197.6cm)
91" (231.1cm)
160 sq. in.
EN
Drywall
LV74
39 15/16" (101.4cm)
20 1/8" (51.1cm)
89 13/16" (228.1cm)
91" (231.1cm)
17
W415-1739 / C / 08.03.17