Symbols on the machine
Drain for waste water
Drain for fresh water
Fresh water reservoir filler neck
Parking brake
Foot pedal
1
2
Before Startup
Remove all packaging material except
the wooden palette.
Installing the pushing handle
Insert the pushing handle in the
grooves on the appliance.
Fasten the pushing handle with the 4
screws enclosed in the packet.
Fasten the covering flaps.
Hang in the strain relief clamp at the
pushing handle.
18
Drain the fresh water
tank and waste water
tank prior to tipping the
device.
Lock the rear wheels; remove the
wooden blocks used for stopping the
wheels.
Four indicated floor boards of the pallet
are fastened with screws. Unscrew
these boards.
Place the boards on the edge of the pal-
let. Place the boards in such a way that
they lie in front of the four wheels of the
machine. Fasten the boards with
screws.
Slowly push the machine down from the
ramp.
Removing anti-frost agents
Note:
The device has been flushed with anti-
freeze during manufacturing. This anti-
freeze must be removed before initial start-
up.
Fill in 10 litres of fresh water in the fresh
water reservoir.
Press the foot pedal.
Set the machine switch to basic clean-
ing.
Keep the machine running until the
pressure on the manometer falls.
EN
– 4
Unloading