MOUNTING THE RANGEHOOD
5. Install electrical.
6. Install duct work and tape all joints.
7. Power up hood and check for leaks around duct joints, and if necessary apply more duct tape.
8. Install optional duct cover and/or backsplash. Note that the duct cover and backsplash are
sold separately.
9. Reinstall the baffle filters.
INSTALLATION
duct/silver
tape
7