Carson Helikopter BIG EC-135 Air Zermatt 507010 Mode D'emploi page 14

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

On the right hand side you
GB
attach the spring according to
picture 4. The spring adjuster
is mounted by using a Phillips
head screw and the spring is
put into the holder by means of
tweezers.
On the left-hand side of the
main board (Illustration 5)
there is a small connector,
which you must carefully
remove.
It is imperative that the board
is not damaged. Then undo
the screw to which the aerial
is secured (Illustration 6).
Now the main board can be
removed by means of the four
screws (Illustration 7).
14
CARSON Helikopter BIG EC-135 „Air Zermatt" 507010
Picture 5
Picture 7
Picture 4
Picture 6

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Big ec-135

Table des Matières