Solution For Retrospective Installation - Thomas CentraClean 15-301 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 37

10. Solution for retrospective installation

A suction line can be installed in retrospect
- in a corner of a room
- in a closed down fireplace
- in planned panelling (on the wall and/or ceiling)
- in a ventilation shaft
Proceed as follows to install the suction line in a corner of the room:
1. Make the necessary breakthrough for the suction line
to the required points
The diameter of the drill hole (drill diameter › socket diameter)
must be minimum 66 mm for HT pipes (DN 50).
Suction line
continued
Saugleitung
weitergeführt
Suction line
Saugleitung
ends with
nur bis zur
Saugdose
vacuum
socket
2. Lay the pipe line system
3. Fit the vacuum sockets temporarily, check function
and determine the dimensions for the inner construc-
tion work and outer panelling.
– The vacuum sockets are to be installed approx. 700 mm above
the floor.
4. Mark position of vacuum socket on the outer panel-
ling and drill a hole for vacuum socket
– Suitable useable material: e.g. Rigips, chipboard, sectional board,
aluminium sheeting, HDF boards, stainless sheet steel, etc.
36
Breakthrough with
Breakthrough handmade
Durchbruch
Durchbruch
"von Hand"
"mit Bohreinheit"
use of drill
10
5,5
18
10
5,5
18
13
Example of installation for laying a suction line in the
corner of a room.
13
5. Produce and fit subconstruction for outer
panelling
– Suitable materials: Roofing slates, aluminium brackets, sheet steel
brackets.
6. Fit outer panelling and fasten, paint or hang
wallpaper same
7. Fit vacuum sockets
Our technical service department will be only too pleased to be
available to you should you have questions.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Centraclean 18-451Centraclean 34-451Centraclean 451 za

Table des Matières