BWT SL-119-MR Notice D'installation Et Conseils D'utilisation page 14

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2.2.1 Install the Hung liner locking track
2.3
Sealing in the coping stones
Spread a layer of fibrous concrete
Spread a layer of fibrous concrete over an area equivalent to two 500 mm coping stones in order to seal
in the copings (the mesh must be totally encased in the fibrous concrete).
Setting the coping stones
Remove the support column from the skimmer mouth
Only when the concrete is completely set.
14/32
2020/10 - Indice de révision : D - Code : 25110
All manuals and user guides at all-guides.com
CONSTRUCTION & RÉNOVATION

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sb-118-mr

Table des Matières