Instructions for installation and use
1. About this instruction manual
Read these installation and operating instructions carefully and keep them within
reach of the infrared cabin. This ensures that you can refer to information on
safety and operation at any time.
These installation and operating instructions can also be found in
the downloads section of our website: www.sentiotec.com/downloads.
Important note:
● Before you begin work, check the parts list to ensure that all the individual
parts have been delivered. If you discover any missing parts, notify your
dealer within 14 days of receiving the sauna cabin.
● The room that the sauna is installed in must be dry and ensure an appropriate
amount of air circulation.
● The floor must be level and even, preferably a stone or tiled floor.
● A minimum room height of 230 cm is required for the cabin installation work.
● A distance of at least 5 cm from the wall must be maintained.
● The inside of the wooden parts used must not be handled with any impreg-
nating material.
● You need an assistant for the installation.
● Wood is a natural product that can swell, shrink or warp, despite good stor-
age. For this reason, some force may be necessary during the installation.
All screw fittings must be pre-drilled.
Attention!
The electrical connection may only be performed by a qualified electrician
or similarly qualified person.
p. 3/8
EN