Télécharger Imprimer la page

Steelcase Ganging Universal Laminate Storage with Answer Beam Instructions De Montage page 3

Publicité

Les langues disponibles

Les langues disponibles

®
Universal Laminate Organizer and
Overhead Storage Ganging
TIP: Clamping the units together can aid in
accurate drilling.
1.
Attach the mid-storage units to the beam per
Assembly Direction 100137 - Assembling
Mid-Storage to the Answer Beam.
2.
Measure, mark and drill two (2) or four (4) 5/16"
diameter ganging holes located as shown.
3.
Secure the units together with two (2) or four (4)
1/4-20 ganging bolts and nuts per the length shown
below.
NOTE: Over tightening bolts could damage units.
All Mid-Storage Applications
Side-to-Side
Back-to-Back
NUT
3"
Organizer End Section View
5mm HEX
Bolt Length
45mm
60mm
BOLT
5/16" DIAMETER
3"
THROUGH HOLE
Organizer Front View
for Back-to-Back Ganging
3"
for Side-to-Side Ganging
3"
Bolt
Length
Overhead Storage Front View
for Back-to-Back Ganging
3"
3-3/8"
Overhead Storage End Section View
for Side-to-Side Ganging
3"
3"
3-3/8"
3"
3"
3"
3"
3"
Page 3 of 12
100144 Rev A

Publicité

loading