Télécharger Imprimer la page

Steelcase Ganging Universal Laminate Storage with Answer Beam Instructions De Montage page 2

Publicité

Les langues disponibles

Les langues disponibles

®
Universal Laminate 1H, 1.5H, and 2H Low
Storage Ganging
TIP: Ganging is simplified if done before the top attachment.
1.
Attach the first lower storage unit(s) to the beam per
Assembly Direction 100117 - Lower Storage-to-Beam
Connectors for Answer Beam.
2.
Measure, mark and drill four (4) 5/16" diameter ganging
holes located as shown.
TIP: Clamping the units together can aid in accurate drilling.
3.
Secure all side-to-side units together with four (4) 1/4-20 x
45mm ganging bolts and nuts, and secure all back-to-back
units with four (4) 1/4-20 ganging bolts and nuts per the
length shown below.
NOTE: Over tightening bolts could damage units.
Bolt Length for Back-to-Back Applications
(ganged to)
Unit #1
30", 36" Open and
30", 36" Open and
Hinged Door
Hinged Door
48", 60", 72" Credenza
48", 60", 72" Credenza
(all configurations)
(all configurations)
30", 36" Open and
Hinged Door
30", 36" Drawer
48", 60", 72" Credenza
(all configurations)
30", 36" Drawer
30", 36" Drawer
NUT
Unit #2
Bolt Length
30mm
45mm
50mm
BOLT
3"
5/16" DIAMETER
THROUGH HOLE
Low Storage Front View
for Back-to-Back Ganging
5mm HEX
Bolt
Length
3"
3"
Low Storage End Section View
for Side-to-Side Ganging
3"
3"
3"
1-1/2"
1-1/2"
Page 2 of 12
100144 Rev A

Publicité

loading