Step 20 (optional)
Only perform this step in preparation for winter, if you decide not to
disassemble the shelter.
20.Install the Supporting Posts for winter (B2 and B3) under the horizontal supporting beams, that is,
the second and third beam from the front of the shelter. Proceed to this step before the winter season
to enhance the roof loading ability when there is an accumulation of snow.
NOTE:
In the above illustration, some roof panels are removed in order to clearly show where the
Supporting Posts (B2 & B3) should be placed. Do not remove roof panels for this step.
F
G
B2
B3
Page
26