Uberhaus 72255106 Guide De L'utilisateur page 25

Abri-soleil 10 x 12 pi
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step 19
B
S1
S1
S
S
S1
R
B
S/S1
×2
19.Install the Screen (S) on the Hooks of the Rail on the inside of the Shelter. Attach the Screen
around the Posts (B) with the Velcro straps.
NOTE:
To install Curtains, install the Curtain on the outer Rail, then install the Screen on the Rail
inside the Shelter.
NOTE:
The two shortest Screen Panels are installed on the sides of the Shelter. When the longer
Panel is installed, ensure the corner of the Screen aligns with the Post (B).
Page
25

Publicité

Table des Matières
loading

Table des Matières