SKYLOTEC MOBILFIX AP-018 Instructions De Montage Et D'emploi page 32

Comportant l'œillet et la cheville terminal
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Enter building sketch on page 2 and checklist on page 2
Roof plan (please draw lines with a ruler):
(If there is insufficient space, please use separate sheets and attach them to the protocols!)
Checklist:
Substrate as expected (no doubts concerning load-bearing capacity)
instructions of the
manufacturer
Connection technology assembled as specified by the respective
manufacturer
Identification sign/s is/are present and affixed
moves easily
rail/cable system
Trial walkthrough was executed and passed
(Only for rail/cable system)
and
have been transferred to the owner
Additional information
Remarks by chief assembler:
Handed out to:
(Owner or owner's representative)
Construction site manager installation company
MAT-MA-0007 MOBILFIX
Verification
installation executed in accordance with the installation
Only
corrosion-protected
Pre-tension
System/attachment point is free of contamination and runner
System is assembled free of defects and has been transferred
installation instructions, use instructions are present, complete,
Name in block letters
Stand: 08/11/2016
Name in block letters
of
load-bearing
fastening
elements
All fastenings photographed with number plate
installation
plan
is
correct
(only
Runner was transferred to the owner (only for
Example:
yes
no
N.R.
capacity
present
were
used
stored
on
site
rope
system)
Signature
Seite 14 von 16
Signature

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mobilfix ap-018-t

Table des Matières