SKYLOTEC MOBILFIX AP-018 Instructions De Montage Et D'emploi page 30

Comportant l'œillet et la cheville terminal
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Description/sketch of roof layout/installation conditions
Herewith, we confirm that
the installed fall protection system
(short description of the fall protection system used, including information on relevant system dimensions,
batch/serial number, etc.)
.......................................................................................................................................
was installed properly and in compliance with all provisions of the general building inspectorate approval
Z-14.9-704 of Deutsches Institut für Bautechnik with respect to all the details and
the building products (anchoring device, as well as its components and fixtures) used for producing the
object of approval were identified in accordance with the provisions of the respective usability certificate
(standard, general building inspectorate approval, European technical approval).
..................................
(place, date)
(This statement must be handed over to the principle for possibly required forwarding to the competent building
control authority)
MAT-MA-0007 MOBILFIX
..............................
(stamp/signature/abbreviation)
Stand: 08/11/2016
Seite 12 von 16

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mobilfix ap-018-t

Table des Matières