Télécharger Imprimer la page

Miele professional PT 8807 D Mode D'emploi page 15

Sèche-linge

Publicité

Fittings
Without base
(supplied)
2 × clamps
2 × screws DIN 571 (Ø × length)
2 × rawl plugs (Ø × length)
Machine must be bolted to the floor!
Fixing materials for a floating screed floor are to be provided
on site.
On concrete base
2 × clamps
2 × screws DIN 571 (Ø × length)
2 × rawl plugs (Ø × length)
Machine must be bolted to the floor!
Fixing materials for a floating screed floor are to be provided
on site.
Machine data
Unit width
Machine depth
Unit height
Casing width
Casing depth
Minimum width of delivery access to installation site
Recommended rear wall gap (measured to front of machine)
Min. wall gap (to rear edge of lid)
Net weight
Dynamic floor load, max.
Average heat dissipation
(depends on ambient room temperature and selected
program)
Noise level
Sound pressure level (measured at a distance of 1 m from the
machine and at a height of 1.6 m).
Installation should only be carried out by authorized fitters in accordance with valid regulations!
Follow installation instructions when installing machine! All rights reserved.
Installation plan: PT 8807 D (steam)
Date: 01.2015
¼ x 1 9/16"
6 × 40 mm
3/8 x 2"
10 × 50 mm
¼ x 1 9/16"
6 × 40 mm
3/8 x 2"
10 × 50 mm
47 ½"
1206 mm
54 ½"
1384 mm
64 9/16"
1640 mm
47 ¼"
1200 mm
50 3/8"
1279 mm
48"
1220 mm
70 7/8"
1800 mm
19 11/16"
500 mm
702 lb
318 kg
3708 N
3708 N
3753 BTU/h
1.1 kW
73.6 dB (A)
73.6 dB (A)
62 dB (A)
62 dB (A)
Page: 15

Publicité

loading