Machine connections:
Electrical
Standard voltage (as supplied)
connection
Electrical connection must comply with national regulations.
Connection using multi-pole wall lockable socket in
compliance with IEC/EN 60309 and IEC/EN 60947 is
recommended in order to simplify electrical tests.
If machines are hard-wired, a multi-pole mains switch must be
provided on site.
A wall socket or mains isolator must be accessible after
installation.
Equipotential
Connection with male thread
bonding
with washers and nut.
Accessories to be ordered separately
If necessary, equipotential bonding with good galvanic
contact must be provided in accordance with all appropriate
national and local regulations.
Steam pressure
Steam
connection
Boiling point
Steam supply capacity
Connection thread (on site)
Steam valve, steam filter and steam stopcock must be
provided on site.
Supply lead steam valve (length). The supply lead for the
electric steam valve is included.
The steam valve should be installed close to the steam
connection.
Note installation instructions for steam-heated Miele tumble
dryers.
Condensate
Connection thread (on site)
connection
Stopcock and condensate separator to be provided on site.
The condensate drain should be installed such that the heater
banks self-drains when the machine is not in operation.
Consequently, there should be no build-up of condensate in
the heater bank. The installation of bell-shaped condensate
drains is recommended.
Vented
Max. nominal air flow in vented mode
Max. permissible pressure loss
Connection on machine side (ext. diameter)
Connection pipe provided on site (int. diameter)
Max. temperature
As relative humidity inside the vent ducting can be as high as
100%, suitable measures must be taken to prevent a
backflow of condensate into the machine.
Air intake
Standard connection: Air intake from installation site
Alternative connection: Ducted air intake (from outside
building)
Lid removal exposes live components! For safety reasons,
the pipe connected for central air intake should be at least
900 mm (35 ½") long and secured using two screws.
Installation plan: PT 8807 D (steam)
Date: 01.2015
Frequency
Rated load
Fuse rating
Cable screw connector
Connection cable
Unobstructed air intake into room recommended (corre-
sponding to 3 times the vent cross-section of machine)
A sufficient supply of fresh air should be ensured to
replace the air extracted.
Connector on machine (int. diameter)
Connection pipe provided on site (ext. diameter)
V
3 AC 208
Hz
60
kW
1.9
A
3 × 10
M 25
Supplied without
power cord
3/8 x 1 3/8"
10 × 35 mm
10 M
87 – 145 psi
600 - 1.000 kPa
329 - 363°F
165 – 184°C
157 lb/h
71 kg/h
½" internal thread
(NPT)
19 11/16"
500 mm
½" internal thread
(NPT)
647 cfm
1100 m³/h
0.04 psi
300 Pa
5 15/16"
150 mm
5 15/16"
150 mm
176°F
80°C
83 in²
531 cm²
6 5/16"
161 mm
6 5/16"
160 mm