Sommaire des Matières pour Miele professional PT 8807 D
Page 1
Installation Plan Tumble dryer Plan d'installation Sèche-linge PT 8807 D (Steam) PT 8807 D (Vapeur) en - CA fr - CA 05.15 M.-Nr. 10 168 250/ 00...
Pneumatic steam valve (CDN version) Regulatable steam pressure 0 – 145 psi 0 - 1000 kPa Connection gauge Inch ½“ (NPT) Supply point and pneumatic valve controls must be provided on site. Installation plan: PT 8807 D (steam) Date: 01.2015 Page: 13...
Page 14
160 mm Lid removal exposes live components! For safety reasons, the pipe connected for central air intake should be at least 900 mm (35 ½”) long and secured using two screws. Installation plan: PT 8807 D (steam) Date: 01.2015 Page: 14...
Page 15
1.6 m). Installation should only be carried out by authorized fitters in accordance with valid regulations! Follow installation instructions when installing machine! All rights reserved. Installation plan: PT 8807 D (steam) Date: 01.2015 Page: 15...
Si un raccordement fixe est prévu, un dispositif de disjonction phase et neutre doit être présent sur l'installation. La prise murale ou le dispositif de sectionnement doivent être visibles et directement accessibles après l’installation de l’appareil. Plan d’installation : PT 8807 D (vapeur) Date: 01.2015 Page: 16...
Page 17
Pour des raisons de sécurité, il faut installer un tuyau sur l’aspiration d’air frais centrale du sèche-linge (longueur minimum de 900 mm – 35 1/2") et le fixer par deux vis. Plan d’installation : PT 8807 D (vapeur) Date: 01.2015 Page: 17...
Page 18
L’installation doit exclusivement être effectuée par des installateurs agréés, conformément aux prescriptions et aux règlements applicables et aux règlements de prévention des accidents. Veuillez impérativement vous conformer à la notice de montage lors de l’installation de l’appareil. Sous réserve de modifications. Plan d’installation : PT 8807 D (vapeur) Date: 01.2015 Page: 18...