4. Conformity marking
5. Power voltage and frequency
6. Month / Year of manufacture
7. Serial number
8. Article code
9. Class II; Dual insulation
Write the identification data of the
machine in the specific space on the
label on the back of the cover page.
IMPORTANT Quote the information on
the product identification label whenever you
contact an authorised service workshop.
IMPORTANT The example of the
Declaration of Conformity is provided
on the last pages of the manual.
3.4 MAIN COMPONENTS
The machine is composed of a series
of main components that have the
following functions (fig.1 ):
A. Power unit: it drives the rotor.
B. Blower tube: it is the component through
which the air flow is discharged.
C. Handgrip: it makes it possible
to control the machine.
D. Battery (accessory available upon
request, paragraph 14.1): device that
supplies electric current to the tool; its
specifications and regulations for use
are described in a specific manual.
E. Battery charger (accessory available upon
request, par. 14.2): device used to recharge
the battery; its specifications and directions
for use are described in a specific manual.
4. ASSEMBLY
IMPORTANT The safety regulations to
follow during machine use are described
in chapter 2. Strictly comply with these
instructions to avoid serious risks or hazards.
For storage and transport purposes, some
components of the machine are not installed
in the factory and have to be assembled after
unpacking. Follow the instructions below.
Unpacking and completing the assembly
should be done on a flat and stable surface,
with enough space for machine handling
and its packaging, always making use of
suitable equipment. Do not use the machine
until all the indications provided in the
"ASSEMBLY" section have been carried out.
4.1 ASSEMBLY COMPONENTS
The packaging includes assembly components.
4.1.1 Unpacking
1. Carefully open the packaging, paying
attention not to lose components.
2. Consult the documentation in the
box, including these instructions.
3. Remove all the unassembled
parts from the box.
4. Remove the machine from the box.
5. Dispose of the box and packaging in
compliance with local regulations.
Before assembling, make sure the
battery is not inserted in its housing.
4.1.2 Assembly of the blower tube
1. Align the blower tube body (Fig. 3.A) with the
protrusion (Fig. 3.B) of the air outlet (Fig. 3.C).
2. Push the tube (Fig. 3.A) and rotate it 90°
clockwise following the direction of the arrow
("closed padlock") until it is it firmly engaged.
– To remove the tube, rotate it counter-
clockwise following the direction
of the arrow ("open padlock") .
IMPORTANT Stop the machine and
always remove the battery (paragraph 7.2.2)
whenever the blowing tube is removed.
5. CONTROLS
5.1 THROTTLE CONTROL DEVICE
The throttle control (Fig. 1.F) fulfils two functions:
1. it starts/stops the machine and, at the
same time, it engages/disengages
the rotation of the rotor;
2. it makes it possible to control
the speed of the rotor.
To start, press the throttle control and wait
2-3 seconds for the machine to start.
Starting the machine causes the
rotor to start rotating at the same time.
EN - 8