Installing Ceiling Brackets & Vertical Posts - NewAge Products VERSARAC PRO Guide D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installing Ceiling Brackets & Vertical Posts
1
Pre drill 3.125in deep pilot holes into the ceiling stud using a 3/16" drill bit.
Install first top ceiling bracket, at the points marked in step F on page 12, using two lag screws
and two flat washers.
NOTE:
2
A. If the location of the VersaRac Pro is on a stud, install the ceiling bracket parallel to the
ceiling stud.
B. If the location of the VersaRac Pro is not sitting exactly on a stud, install the ceiling bracket
perpendicular to the two studs.
A.
1
NOTE:
Make sure the lag bolts are tight against
the stud but DO NOT over-tighten the
Lag screws.
If lag screws are over-tightened, the
screws could snap or the hole may be
stripped.
B.
13

Publicité

Table des Matières
loading

Table des Matières