NewAge Products VERSARAC PRO Guide D'installation page 12

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Plan the Installation Location
D
Mark two curved lines 105in diagonally from Points A1 and B1 as shown. Mark point C0 and
D0.
Draw the line from A1 to C0 and extend the line to the center of the next stud and mark point C1.
E
Repeat for point B1 to D0 and then mark point D1.
Mark points A2, B2, C2 and D2 according to the positions which you have planned to install the
F
ceiling brackets.
NOTE: The ceiling
brackets at point A and
B can be orientated
horizontally if the edge
of the VersaRac Pro is not
aligned with the center
of the stud.
12
A1
105in
105in
B1
Extend the line upto next
available stud after C0 and D0 points
A1
B1
A2
A1
B1
B2
C0
D0
C1
C0
D0
D1
C1
C2
D2
D1

Publicité

Table des Matières
loading

Table des Matières