Water Ace R50VLT Notice D'utilisation page 4

Pompe submersible en fonte et pour les eaux résiduaires
Masquer les pouces Voir aussi pour R50VLT:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Vertical float switch installation (for replacement)
Vertical switch is pre-installed at the factory.
See Figures 1 and 2.
1. Mount the bracket to the switch body.
2. Mount the float on to the rod.
3. Mount the retaining strap and float stop on to the rod.
4. Turn the switch upside down and slide the rod into the
switch housing.
5. Fasten the rod with the pin.
6. Mount the switch assembly on the pump.
Figure 1: Make sure pin engages switch rod (Step 4).
WA534
All manuals and user guides at all-guides.com
4A
4B
Figure 2: Vertical switch assembly.
5284 0206
4
Switch Housing
5
1
Bracket
Float
Rod
4
2
Float
3
Float Stop
6
Pin
Retaining Strap
5269 0106

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

R75vlt

Table des Matières