Fuse holder
Relay
2
3
en
All manuals and user guides at all-guides.com
1
2
Assembling the E-Socket for
mounting on the left side
Preparing for installation
1
Orientate the Junction box with the opening
facing to the left.
Do not damage the power cables and wires.
2
Insert the cable gland at the top of the junction
3
box and fit the locknut. Do not tighten.
3
Insert the filler plug at the bottom of the
junction box and fit and tighten the locknut.
4
Feed power cord through the cable gland.
•
Feed the stripped end with the cable shoes through
the gland.
•
Tighten the gland.
Ensure the cable is clamped firmly in the gland.
Only then will the IP54 sealing be effective.
Take care not to damage the cables; keep them
clear of the locking mechanism so they do not
obstruct it.
4
8