Hinge
socket on
topside
Facing left
en
All manuals and user guides at all-guides.com
Relay
Fuse holder
2
2
3
Assembling the E-Socket for
1
mounting on the right side
Preparing for installation
1
Orientate the Junction box with the opening
facing to the right.
Do not damage the power cables and wires.
2
Insert the cable gland at the top of the junction
box and fit the locknut. Do not tighten.
3
3
Insert the filler plug at the bottom of the
junction box and fit and tighten the locknut.
4
Feed the power cord end with the cable shoes
and the flat cable lugs through the cable gland.
•
Tighten the gland.
Ensure the cable is clamped firmly in the gland.
Only then will the IP54 sealing be effective.
Take care not to damage the cables; keep them
clear of the locking mechanism so they do not
obstruct it.
4
6