Module Preparation
Place fuses into the control module.
A. Observe fuse amperage ratings. Place
the 5 Amp fuse into the "Main B+"
location. Populate the remaining fuse
locations, as shown in the diagram,
with the 15 Amp fuses. Make sure to
populate the 15 amp fuse with the
"open" fuse label on the module.
Install DNA into the control module.
B. Insert DNA into the control module.
Ensure the DNA assembly snaps
completely in place.
6
1 2 1 2
1 2
DNA