Whale Compac 50 Mode D'emploi page 5

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

deck and check flow direc-
tion.
4. Work the rubber gaiter up
through the hole until its
flange rests on the deck.
5. Place deck plate cover
on top of the deck and
secure with the 4 screws
provided into the pump
body.
6. Attach 1" I.D. (25 mm)
smooth bore reinforced hose
with stainless steel worm-
drive hose clips. Tighten
clips to prevent air leaks.
7. With thru-hull discharge,
make sure that the dis-
charge point is well above
the water line.
8. Check the installation for
air leaks, correct priming
and discharge.
Operation:
The Whale Compac 50
ensures efficient throughput
with an easy pumping
action. Full even strokes will
obtain the best results. Two
clips are provided for storing
the handle, when the pump
is not in use.
Performance Table
At 60
Output
strokes/min
US
10
Gal/Min
Litres
39
Performance data is based
on factory tests and is typi-
cal of what may reasonably
be achieved. Actual per-
Old Belfast Road, Bangor, N. Ireland Tel: +44 (0)28 9127 0531 Fax: +44 (0)28 9146 6421
formance may vary depend-
ing on installation and oper-
ating conditions.
Maintenance:
Inspection:
Regular inspection of the
pump is recommended.
Rubber components should
be replaced if worn, or
every three years regard-
less of condition.
Replacement components
and Service Kits (AK8035)
are available from dealers
or direct from the manufac-
turer. It is recommended
that a Service Kit is kept on
board.
Winterising:
At the end of season, drain
all the water in the pipework
and pump chamber.
Changing the Diaphragm
and Valves:
Diaphragm:
1. Slacken and remove the
clamping ring screws.
2. Remove clamping rings,
(hoses may be left
At 80
attached).
strokes/min
3. Remove clamping plate
screw and clamping plate.
13
4. Replace diaphragm
ensuring the centre portion
49
of the diaphragm projects
into valve chamber.
5. Check diaphragm is
"seated" in the cover
grooves.
Munster Simms Engineering Lltd
Web: www.whalepumps.com Email:info@whalepumps.com
Valves:
1. Unscrew the 4 self
ping screws at the base of
the inlet/outlet nipples
(hoses can be left attached).
2. Remove and replace the
valves ensuring that they
are correctly seated in the
pump body groove.
3. Replace the nipples in
their mounting position and
resecure.
Helpful Hints:
Pump fails to prime or
chokes:
·
check inlet hose connection
is airtight and does not col-
lapse during the suction
stroke
·
inspect inlet and outlet
valves for blockages. Clear
with finger or screwdriver
and test
·
solid objects in the body of
the pump may not prevent
its operation but should be
removed to prevent damage
Warranty
This Whale Product is cov-
ered by 5 years warranty.
Please see the enclosed
document for details of our
statement of limited warran-
ty.
Ref: sr_182.56_fr_eng_1210
tap-

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bp0350

Table des Matières