Mitsubishi Electric PEFY-P-NMHU-E Manuel D'installation page 3

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5
[Fig. 5.1.1]
Unit body
Lifting machine
[Fig. 5.2.1]
6
[Fig. 6.2.1]
5.1
[Fig. 5.1.2]
Nuts (field supply)
Washers
M10 Hanging bolt
(field supply)
5.2
Bottom of indoor unit
(
Air inlet
Refrigerant piping (liquid)
Refrigerant piping (gas)
Control box
Usual drain outlet
Air outlet
Drain piping (When the optional drain-up mechanism is used.)
6
[Fig. 6.1.1]
6.2
163 [6-13/32]
92
[3-5/8]
200 [7-7/8]
343 [13-17/32]
387 [15-1/4]
Type 15 - 54
Type 72 · 96
6.1
Flare cutting dimensions
Refrigerant pipe sizes & Flare nut tightening torque
Apply refrigerating machine oil over the entire flare seat
surface
(mm) [in]
3

Publicité

Chapitres

Table des Matières
loading

Table des Matières