Instrument Components; Measurement Preparations; Change Battery - Leica Sprinter 50 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 51

2. Instrument Components

a
b
c
Sprinter 01
a) Horizontal fine motion
screw
b) Battery compartment
c) Circular level
d) Gunsight
e) Focusing knob
Container Contents
Sprinter, batteries (4x), allen key, user manual, error
and operation messages leaflet, strap.
Instrument Components
d
e
f
g
h
i
j
f) Handle
g) Eyepiece
h) LCD display
i) Base plate
j) Levelling footscrew
Accessories
Tripod, aluminum staff (region dependant). (Optional:
sunshade, 4 rechargeable batteries and charger.)

3. Measurement Preparations

3.1 Change battery

Insert 4 AA dry cells according to the positive and
negative signs as indicated on the holder.
Always replace with a complete battery set!
Do not use old and new batteries together.
Do not use batteries from different manufac-
turers or batteries of different types.
3.2 Set-up instrument
Levelling
• Set up the tripod. Extend the legs to a suitable
length and ensure that the tripod head is approxi-
mately level. Tread the tripod shoes firmly into the
ground to ensure stability.
• Mount the instrument on the tripod by screwing the
tripod screw onto the base of the instrument.
• Use the three levelling foot screws to center the
circular bubble in order to level the instrument.
3
EN
DE
FR
ES
IT
PT
NL
NO
SV
FI
DA
Sprinter 50 - 1.0.0en

Publicité

Table des Matières
loading

Table des Matières