20°
5-45°
2
Check the installation of the system
2.14
Is the safety valve free of all insulating materials?
Has the installation system been checked for visible damage?
2.15
Has the original heating element been installed by an approved electrician?
2.16
Has the heating element been installed according to the enclosed installation instructions?
2.17
Has the cold and/or hot water been connected correctly?
2.18
Date of fi lling
Date of initial commissioning
30°
Lista di controllo per la messa in funzione
Points à vérifier lors de la mise en service
Lista de verificación para la puesta en marcha inicial
Lista de verificação para o comissionamento inicial
Signature / stamp of installer
EN
Checklist for first start-up
Yes
No
65