Checklist For First Start-Up - EAS ELECTRIC EASCOMPACTX Notice De Montage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 20

Checklist for first start-up

Lista di controllo per la messa in funzione
Points à vérifier lors de la mise en service
Lista de verificación para la puesta en marcha inicial
Lista de verificação para o comissionamento inicial
Serial number of the system:
Name of the customer:
Name of the installation company:
1
Check the positioning of the system
Does the system face south in the Northern Hemisphere and north in the Southern Hemisphere?
1.1
Has it been verifi ed that the system is not in an area that is in the shade during the course of the year?
1.2
Has the system been installed at an installation angle of 5°–45°?
1.3
Has the system been installed at a minimum distance of 1 m from the walls or the edge of the roof?
1.4
2
Check the installation of the system
2.1
Was the provided manual used?
2.2
Is the operating pressure below 10 bar?
Has the system been fi lled correctly according to the instructions in the manual?
2.3
2.4
Are the ventilation openings free and/or not closed?
Has the protective fi lm been removed from the glass/bird protection?
2.5
If the cold water pressure in the main line exceeds 10 bar:
2.6
Has a pressure reducer been installed?
Have the static specifi cations been taken into account?
2.7
To avoid problems with moisture or water ingress on the roof, the pipes leading into the roof must be
particularly well-sealed. The construction engineer on site should give you precise instructions that are
2.8
tailored to the type of roof construction.
All connecting pipes must be very well-insulated to protect against frost and damage by UV radiation.
2.9
Has an insulating material been used that corresponds to the local weather conditions?
Have all the provided fi ttings been used?
2.10
Are all connections free from heavy loads and/or have they been designed to be fl exible?
2.11
Has the system been checked for leaks?
2.12
The system can produce hot water with temperatures above 60 °C.
2.13
Has the recommended mixing valve been used?
64
30°
Installation date of the system:
Customer address | Street | City (country):
Telephone number of the installation company:
EN
20°
5-45°
Yes
No
Yes
No

Publicité

Table des Matières
loading

Table des Matières