Mounting The Lcd Monitor; Tools Required - Waeco PerfectView M511L Instructions De Montage Et De Service

Masquer les pouces Voir aussi pour PerfectView M511L:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 32
_RV-511S.book Seite 26 Mittwoch, 15. März 2006 3:08 15

Mounting the LCD monitor

The remote control has the following control elements:
No. in 0,
Designation
page 6
1
2
3
+
4
5
+
6
7
+
8
9
+
10
V1/V2
11
SYS
6
Mounting the LCD monitor
6.1

Tools required

For installation and assembly you will require the following tools:
Measuring ruler (1 4, page 3)
Centre punch (1 5, page 3)
Hammer (1 6, page 3)
Drill bit set (1 7, page 3)
Drill (1 8, page 3)
Screwdriver (1 9, page 3)
26
All manuals and user guides at all-guides.com
Description
Switches the monitor on or off (stand-by).
Reduces the brightness.
Increases the brightness.
Reduces the colour value.
Increases the colour value.
Reduces the contrast.
Increases the contrast.
Reduces the audio volume.
Increases the audio volume.
Switches from video source 1 to video source 2
and vice-versa.
No function assigned.
PerfectView M511L

Publicité

Table des Matières
loading

Table des Matières