Installation Checklist - Amana SBD20S4E Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Checklist

This checklist is for personal records only.
Consumer Installer
Notes
Consumer's Signature
Doors
Doors are aligned with each other. (After food has been added to refrigerator ,
consumer should check door alignment).
Doors seal completely to refrigerator cabinet.
Handles are solidly attached to doors.
Touchmatic
Electronic and Ice 'N Water
If doors were removed to install refrigerator, top hinge wire connectors are
reconnected.
Leveling
Refrigerator is stable.
Toe grille is properly attached to refrigerator.
Ice Maker
Water supply to refrigerator is turned on.
Water leaks are not present at connection between household water supply and
refrigerator. (After 24 hours, consumer should check connection for water leaks.)
Ice maker arm is in on position for ice production. (It may take up to 24 hours for
first harvest of ice.)
Product Literature
Owner's manual is reviewed including the following information.
• product registration card
• Fresh Food and Deepfreeze
• Chiller Fresh
system
• Garden Fresh
crispers
• normal operating sounds
Installer's Signature
Dispenser Models
®
controls
Installer's Company Name/Phone Number
6
Date

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sbd20s4l

Table des Matières