Unpacking The System - Dell PowerEdge 2900 Guide De Mise En Route

Masquer les pouces Voir aussi pour PowerEdge 2900:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Unpacking the System

Unpack your system and identify each item.
Keep all shipping materials in case you need them later.
Installing the Rails and System in a Rack
Once you have read the "Safety Instructions" located in the rack installation documentation for
your system, install the rails and the system in the rack.
See your rack installation documentation for instructions on installing your system in a rack.
For a tower system, see the documentation included with your system on installing the system
stabilizer feet.
6
Getting Started With Your System

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ecm01

Table des Matières