Programme
Strijkdroog (Iron Dry)
Kastdroog (Cup-
board Dry)
15. INSTALLATION
15.1 Unpacking
CAUTION!
Before use all parts of the
transport packaging must be
removed.
1. Open loading door.
2. Pull off adhesive strips from inside
machine on top of drum.
All manuals and user guides at all-guides.com
Spun at / residual humidity
1000 rpm / 60%
1400 rpm / 50%
1000 rpm / 60%
Synthetica (Synthetic) 3 kg
1200 rpm / 40%
800 rpm / 50%
Drying time
115 min.
75 min.
87 min.
40 min.
46 min.
3. Remove foil hose and polystyrene
padding from the machine.
15.2 Vent hose
As to the outlet itself, if you
have decided on a install wall/
window grille, a good local
builder's merchant can
supply you with the
necessary fittings and
installation advice.
Make sure that the vent hose
length is less than 2 m, and
that it contains no more than
2 bends.
ENGLISH
37
Energy
consump-
tion
4,25 kWh
2,55 kWh
3,20 kWh
1,20 kWh
1,47 kWh