7
7
Mounting
7.1 General Information
The following connections need to be established on the heat
pump:
supply/return flow of the brine system
supply/return flow of the heating system
Temperature sensor
power supply
7.2 Heating and Hot Water
Connection
ATTENTION!
The heating system must be flushed prior to connecting the heat pump.
Before completing the heat pump connections on the heating
water side, the heating installation must be flushed in order to re-
move any impurities that may be present, as well as residues of
sealing material, and the like. Any accumulation of deposits in
the condenser may result in a total failure of the heat pump.
ATTENTION!
The supplied strainer must be fitted in the heating water inlet of the heat
pump in order to protect the condenser against the ingress of impurities.
Once the installation on the heating side has been completed,
the heating system must be filled, de-aerated and pressure-
tested.
Consideration must be given to the following when filling the sys-
tem:
Untreated filling water and make-up water must be of drink-
ing water quality (colourless, clear, free from sediments)
Filling water and make-up water must be pre-filtered (pore
size max. 5µm).
Scale formation in hot water heating systems cannot be com-
pletely avoided, but in systems with flow temperatures below
60°C the problem can be disregarded.
With medium and high-temperature heat pumps, temperatures
above 60°C can be reached.
The following standard values should therefore be adhered to
concerning the filling water and make-up water (according to VDI
2035 Sheet 1):
Total alkaline earths
Total heat
in mol/m³ and/or
output in [kW]
mmol/l
≤
up to 200
≤
200 to 600
> 600
< 0.02
Heating water minimum flow rate
The minimum heating water flow rate through the heat pump
must be assured in all operating states of the heating sys-
tem. This can be accomplished, for example, by installing a dual
differential pressureless manifold.
NOTE
The use of an overflow valve is only recommended for panel heating and
a max. heating water flow of 1.3 m³/h. System faults may result if this is
not observed.
EN-6
All manuals and user guides at all-guides.com
Total
hardness in °dH
≤
2.0
11.2
≤
1.5
8.4
< 0.11
Frost protection for installations prone to frost
Provided the heat pump manager and heating circulating pumps
are ready for operation, the frost protection feature of the heat
pump manager is active. If the heat pump is taken out of service
or in the event of a power failure, the system has to be drained.
In heat pump installations where a power failure cannot be read-
ily detected (holiday house), the heating circuit must contain a
suitable antifreeze product.
7.3 Heat Source Connection
The following procedure must be observed when making the
connection:
Connect the brine line to the flow and return pipe heat source
ofthe heat pump.
The hydraulic plumbing diagram must be observed here.
ATTENTION!
The supplied strainer must be fitted in the heat source inlet of the heat
pump in order to protect the evaporator against the ingress of impurities.
In addition, a microbubble deaerator must be installed in the heat
source system.
The brine liquid must be produced prior to charging the system.
The brine concentration must be at least 25 %. Freeze protection
down to -14 °C can thus be ensured.
Only antifreeze products on the basis of mono-ethylene glycol or
propylene glycol may be used.
The heat source system must be vented (de-aerated) and
checked for leaks.
ATTENTION!
The brine solution must contain at least 25 % of an antifreeze agent on a
mono-ethylene glycol or propylene glycol basis and must be mixed prior
to filling.