Install the Electrical Supplies
(cont.)
Water Supply
Water Supply Shut-Off Valve
Steam Line
Pressure Relief Valve (supplied)
Drain Line
Drain Valve
Sizing The Steam Room
DANGER: Risk of electrocution. Disconnect the electricity to the working area at the main breaker
panel before performing these installation steps.
Follow all local electrical codes. All electrical work should be done by a qualified electrician.
Review the illustration showing specific Steam Generator Installation Requirements for your Steam
Generators.
Install the appropriate electrical supplies.
Kohler Co.
3/8" copper line
3/8" NPT female
1/2" copper line (1/2" NPT thread)
3/4" NPT female thread
3/8" copper line
3/8" NPT female thread
480 cu ft (14 cu m)
7
3/8" copper line
3/8" NPT female
1/2" copper line (1/2" NPT thread)
3/4" NPT female thread
3/8" copper line
3/8" NPT female thread
635 cu ft (18 cu m)
1059059-2-E