Kubota GZD15-3 LD Instructions De Montage page 6

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

2
UNPACKING AND CHECKING PARTS
BUNPACKING WOODEN CRATE
1. Hook a hoist to the 4 corners of the crate and raise the
hoist cable until taut.
This serves to prevent the upper part of the crate from
striking the machine when cut.
2. Saw the crate as indicated in the figure below.
A Sawing outside the indicated area may damage the
machine or accessory parts.
A Be sure that the crate is free of other obstructions (e.g.
nails, staples and etc.).
3. Raise the upper part of crate and remove from the
immediate area.
4. Remove the remaining slats from the crate.
These are indicated by the oblique lines in Figure 1.
Figure 1: Cutting area of the crate
(1) Nylon band
All manuals and user guides at all-guides.com
(A) Front
(B) 300 mm
BUNPACKING IRON CRATE
1. Hook nylon ropes at the four corners of the iron-crate's
top stay. Pull up the nylon ropes until they get just tight.
2. Remove the six bolts from behind the vertical supports
on both sides of the iron crate.
(1) Nylon band
(2) 6-Bolt
(3) Iron crate
3. Lift and detach the top frame of the iron crate.
A In lifting the top frame, be careful to keep the crate's
vertical supports from scratching the machine.
(1) Iron crate

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Gzd15-3 hdGzd21-2 hd

Table des Matières